Please use another Browser

It looks like you are using a browser that is not fully supported. Please note that there might be constraints on site display and usability. For the best experience we suggest that you download the newest version of a supported browser:

Internet Explorer, Chrome Browser, Firefox Browser, Safari Browser

Continue with the current browser

Siemens Energy secures major order for the largest LNG-to-power complex in Latin America

The picture shows a model of the new combined cycle power plant GNA  II in the Port of Açu in Brasil

Final assembly gas turbine factory Berlin

The scope for Siemens Energy foresees the entire power island delivery, that consists in three highly efficient HL class gas turbines, one steam turbine, four electric generators and three heat recovery steam generators (HRSG), in addition to instrumentation and control systems. The services offered by Siemens Energy will also cover long-term operation and maintenance (O&M) of the plant, including advanced remote monitoring and diagnostics by the Remote Operation Center, located in Jundiaí, São Paulo. The power plant is being built together with the consortium partner Andrade Gutierrez who will provide the civil works, the infrastructure and the erection works.
“Our participation in this outstanding project reinforces how our comprehensive LNG-to-Power approach increases value to our partners, and also meets the need for affordable and reliable energy,” said Jochen Eickholt, Executive Board Member of Siemens Energy AG. “This project is strategic, not only for its grandeur, but also for its geographical location, close to the two main gas pipelines systems in Brazil, in the Northeast and Southeast of the country. And not to forget: Our gas turbines for GNA II are ready to burn hydrogen in the future. This means our technology is future-proof for our customers,” Eickholt added.   
The Açu Natural Gas project includes the construction of two thermal power plants, as well as an LNG regasification terminal, based on an FSRU (Floating Storage Regasification Unit), plus substations and transmission lines to connect the plants to the National Interconnected System. The thermoelectric complex is part of the Açu Gás Hub, a project under development at the Açu Port Complex aimed to provide a logistical solution for the receipt, processing, conversion to electricity and transport of natural gas in the Campos and Santos basins, as well as for importing and storing LNG. A second phase will comprise additional thermal power projects under the environmental license for 6.4 GW owned by GNA.
The construction of the GNA I plant started in January 2018 and this plant began its commercial operation in September 2021. The two power plants will supply energy to regions such as Espírito Santo, Minas Gerais and Rio de Janeiro within the National Interconnected System.

Siemens Energy is one of the world’s leading energy technology companies. The company works with its customers and partners on energy systems for the future, thus supporting the transition to a more sustainable world. With its portfolio of products, solutions and services, Siemens Energy covers almost the entire energy value chain – from power generation and transmission to storage. The portfolio includes conventional and renewable energy technology, such as gas and steam turbines, hybrid power plants operated with hydrogen, and power generators and transformers. More than 50 percent of the portfolio has already been decarbonized. A majority stake in the listed company Siemens Gamesa Renewable Energy (SGRE) makes Siemens Energy a global market leader for renewable energies. An estimated one-sixth of the electricity generated worldwide is based on technologies from Siemens Energy. Siemens Energy employs more than 90,000 people worldwide in more than 90 countries and generated revenue of around €27.5 billion in fiscal year 2020.

www.siemens-energy.com.

Read more

Contact

Alfons Benzinger

Siemens Energy

+49 174 155 9447